Shell, El Paso Pipeline moving forward on LNG project in Georgia - WOWK 13 Charleston, Huntington WV News, Weather, Sports

Shell, El Paso Pipeline moving forward on LNG project in Georgia

Posted: Updated:
File photo File photo
  • Local NewsLocal NewsMore>>

  • UPDATE: Route 2 now open following tractor trailer accident

    UPDATE: Route 2 now open following tractor trailer accident

    Monday, August 25 2014 4:00 PM EDT2014-08-25 20:00:48 GMT
    A tractor trailer is blocking part of Route 2. The road is closed until further notice. Drivers heading in both direction are being asked to use the Big Ben Bowen Highway connector by Target to get around.
    A tractor trailer is blocking part of Route 2. The road is closed until further notice. Drivers heading in both direction are being asked to use the Big Ben Bowen Highway connector by Target to get around.
  • EnergyEnergyMore>>

  • UMWA endorses Tennant at annual Labor Day Celebration in Racine, WV

    UMWA endorses Tennant at annual Labor Day Celebration in Racine, WV

    Monday, September 1 2014 3:49 PM EDT2014-09-01 19:49:35 GMT
    United Mine Workers of America will feature food, entertainment and presentations by political and labor leaders at its 76th Annual Labor Day Celebration in Boone County on Sept. 1.
    United Mine Workers of America will feature food, entertainment and presentations by political and labor leaders at its 76th Annual Labor Day Celebration in Boone County on Sept. 1.
  • Feds want nuclear waste train, but nowhere to go

    Feds want nuclear waste train, but nowhere to go

    Monday, September 1 2014 12:11 PM EDT2014-09-01 16:11:52 GMT
    The tracks were supposed to lead to a depository at Yucca Mountain in Nevada, where Congress intended to send radioactive fuel. Instead, the Obama administration cancelled a project that had been criticized as inadequate and opposed by many Nevadans.
    The tracks were supposed to lead to a depository at Yucca Mountain in Nevada, where Congress intended to send radioactive fuel. Instead, the Obama administration cancelled a project that had been criticized as inadequate and opposed by many Nevadans.
  • WV workforce lacks oil and gas expertise — for now

    WV workforce lacks oil and gas expertise — for now

    Sunday, August 31 2014 5:00 PM EDT2014-08-31 21:00:19 GMT
    Despite the relatively high amount of natural gas production in West Virginia, less than 3 percent of employees in some of the major occupations that make up the sector's workforce live in the Mountain State.
    Despite the relatively high amount of natural gas production in West Virginia, less than 3 percent of employees in some of the major occupations that make up the sector's workforce live in the Mountain State.

El Paso Pipeline Partners L.P., and a Royal Dutch Shell subsidiary are moving forward with an expansion at the Elba Island  liquefied natural gas terminal near Savannah, Ga.

The expansion will boost the plant's capacity, allowing them to export more liquefied natural gas when the expansion comes online in 2017 or 2018.

Southern LNG, a subsidiary of El Paso Corporation, owns and operates the terminal.
El Paso Pipeline reports Phase I, consisting of six liquefaction units providing roughly 210 MMcf/d of export capacity, is expected to be in service in late 2016 or early 2017. Phase II would involve two additional liquefaction units.

Kimberly S. Watson, president, Natural Gas Pipelines East Region for Kinder Morgan (KMI), said the $1.5 billion Elba Terminal "will further enhance what has become an abundant natural gas resource in the United States and will result in development of new international markets without straining the availability or cost of natural gas supply to U.S. markets."

"Moreover, the Elba Liquefaction Project will be a positive factor in the overall balance of trade between the U.S. and other countries, as well as generate local and state benefits," she said.

The project was initially announced in early 2013 and will use Shells innovative small-scale liquefaction units, which will be integrated with the existing Elba Island facility and enable rapid construction compared to traditional large-scale plants.

The project is currently in the Federal Energy Regulatory Commission (FERC) review process, which is conducted in accordance with the National Environmental Policy Act. Site construction will begin after FERC issues an Authorization to Proceed and Construct.